HIFraser recently supported the Australian Defence Force Diving School (ADFDS) with an upgrade to...
The HIFraser team delivered a class-wide upgrade to Navy ship breathing air systems. Our team...
The HIFraser Engineering team delivered an improved PAX design to a mining client. Our team...
HIFraser have a successful history in supplying sampling skids across complex projects. For over 60...
Investigating and restoring capability to RAN hospital facilities. HIFraser conducted an...
HIFraser was awarded the design and supply of a replacement Oily Water Separator (OWS) and bypass...
Over the past 25 years, HIFraser has held a critical role in the design, manufacture and...
How our air analysis keeps the Royal Australian Navy safe Over the past 13 years, HIFraser has held...
HIFraser was awarded the task of assisting BAE with the mid-life upgrade of the ANZAC Class Frigate...
HIFraser was awarded the Integrated Logistic Support (ILS) contract for Royal Australian Navy (RAN)...
Working under a redevelopment certainly has its challenges. This project was no different. We liken...
HIFraser delivered a vacuum drainage solution for a Sydney Police Station refurbishment. During the...
HIFraser developed a vacuum drainage solution for a Sydney Childcare project planned for...
Improving vacuum collection systems reliability by up to 70%. HIFraser was awarded the task of...
After 45 years in service, State Water (NSW) sought to upgrade the original hydraulic control...
We were awarded the task to supply the EVAC vacuum collection system for this iconic building. With...